Point kaizen refers to small, isolated improvements that are easy to implement quickly. The impact of point kaizens are typically small but they can have a large impact. Point kaizen are in contrast to line kaizen, plane kaizen, cube kaizen, etc.
lean%20geometry.png

There is no limit to how small a point kaizen can be. That is why it is "zero dimensions". This is good in that most point kaizen are immediate and remove safety hazards, make the workplace cleaner, etc. However one of the criticisms of point kaizens as the only type of continuous improvement effort is that it is hard to see the bottom line impact, or that the positive effects of point kaizen in one area can wipe out the benefits of a point kaizen in anotter area.

An example of a point kaizen would be organizing (5S) a tool cabinet in a machine shop.

A line kaizen would be layout change to create better flow, which may make the tool cabinet totally unnecessary, as the tools could be attached directly to the machine at point of use.

A plane kaizen would be to deploy these layout improvements horizontally (yokoten) to other lines, and this may change the design of the original flow line now that the entire shop is being moved and door-to-door flow can being considered.

A cube kaizen would be to make improvements "up and down" from the plane, or upstream and downstream by including the suppliers and customers (such as configuration engineering, heat treat, assembly, shipping, etc.). This might change how the parts are designed or how orders are released, further changing the layout of the factory (plane).

The idea is that as you go from point to line to plane to cube you are expanding your kaizen efforts enterprise-wide. This expands your thinking from one small area to the entire value stream. Just as in geometry, each type of kaizen adds another dimension (line = 1 dimension, plane = 2 dimensions, cube = 3 dimensions). Moving to each higher dimension brings you closer to the customer, and also to systemic root causes.

Some call cube kaizen "3D kaizen" but this is confusing with 3D as in "dirty, dangerous, difficult" rather than 3D as in "3 dimensions".

There is a common misunderstanding of the definition of kaizen being a series of small, incremental, common sense improvements rather than more broadly any type of improvement that follows certain principles. If you only make small, incremental improvements this is only point kaizen, and that is not ok.

So when is it OK to do point kaizen?

1. When the alternative is no kaizen

2. When the point improvement does not worsen safety, quality, delivery or cost for upstream or downstream processes (i.e. when you avoid local optimization)

3. When it is part of a series of connected point improvements (a weaker version of line kaizen)

4. When the point improvement promotes a behavior change such as a "go see" style of management

5. When the points of improvement are along continuous process (as opposed to discrete processes) and therefore by definition can have an impact similar to a line kaizen

I would rather have people do point kaizen than not do kaizen at all. However it is too easy for people to learn a Lean tool and focus too much on implementing the tool for its sake rather than trying to understand the geometry of kaizen and how to use the tool to go from point to line to plane to cube.

By Jon Miller - December 19, 2006 9:03 AM

Comments

5S-ing "kaizen". This entry clears up a lot. Thanks.

Posted by: Anna - March 19, 2008 4:30 PM

Post a Comment

Comments are moderated to filter spam and inappropriate content. There may be a delay before your comment is published.




Recent Artices
Hospital Improves Patient Flow: 90% Seen in Under 60 Minutes

There is a small hospital in Hiroshima, Japan which has been practicing the Toyota more>>

By Jon Miller - January 6, 2009 9:52 AM0 comments>>
Planning for One Piece Flow Cells

Bas Timmermans from the Netherlands asked a question about OEE and one piece flow cells: more>>

By Jon Miller - January 5, 2009 12:29 PM0 comments>>
Virtual Factory Tours on YouTube

Keep your chin up, global manufacturing! Even though new factory orders dipped recently to record more>>

By Jon Miller - January 4, 2009 4:53 PM5 comments>>
Ask Gemba

We want to make it easier to start conversations and find answers here at more>>

By Jon Miller - January 3, 2009 1:57 PM2 comments>>
5 Ways to Boost Kaizen Consciousness in 2009

Improved quality, reduced cost, better teamwork, faster response to customer needs - there are as more>>

By Jon Miller - January 1, 2009 11:19 PM1 comments>>
HP Printer Pokayoke Example

This is a new HP C7250 printer we purchased a few weeks ago. It's quite more>>

By Jon Miller - December 30, 2008 12:53 AM0 comments>>
Yaruki: The Will to Win Even in Tough Times

RC Bhargava, the Chairman, Maruti Suzuki India recounts the story of Maruti Suzuki and how more>>

By Jon Miller - December 28, 2008 7:53 PM3 comments>>
9 Surprises for U.S. Manufacturing in 2009

1. Will you shut up about kaizen, Tom? Newly appointed U.S. Secretary of Agriculture more>>

By Jon Miller - December 24, 2008 4:05 PM4 comments>>
Let's Do Kaizen, Not Kaizan

It doesn't really matter how you pronounce the Japanese word for continuous improvement through more>>

By Jon Miller - December 23, 2008 12:20 PM0 comments>>
Answers to Lean Thinking Crossword Puzzle #1

Spoiler alert! The answers to Lean Thinking Crossword Puzzle #1 are below. Here are the more>>

By Jon Miller - December 20, 2008 2:20 AM0 comments>>
Lean Thinking Crossword Puzzle #1

Here is a quiz we used as a review of lean knowledge for the team more>>

By Jon Miller - December 19, 2008 3:24 AM0 comments>>
Field Report from Gemba Tour #62, Part 4

Today was day-long visit to a company who is 13 years on their lean more>>

By Jon Miller - December 18, 2008 8:16 AM1 comments>>
Field Report from Gemba Tour #62, Part 3

Today wast the Toyota plant tour day of our Japan Kaikaku Experience #62. I noticed more>>

By Jon Miller - December 17, 2008 5:21 AM0 comments>>
Field Report from Gemba Tour #62, Part 2

I have seen the future of logistics, and it is green. Today we visited more>>

By Jon Miller - December 16, 2008 7:08 AM3 comments>>
Field Report from Gemba Tour #62, Part 1

The last few weeks haven't been very productive ones for writing blog articles due more>>

By Jon Miller - December 15, 2008 5:34 AM2 comments>>
If Blame Helped Solve Problems...

...the interview with Newt Gingrich on Fox News would be a brilliant way to get more>>

By Jon Miller - December 5, 2008 11:07 PM8 comments>>
$34,000,000,000

Sigh. Chrysler wants $7 billion. They asked Congress for this taxpayer money in a 14-page more>>

By Jon Miller - December 2, 2008 8:11 PM5 comments>>
PDCA is About Not Telling Lies

This circle doesn't lie. In fact one could say that used properly, it is more>>

By Jon Miller - December 1, 2008 5:39 AM6 comments>>
With Competitors Like These, Who Needs a Winning Business Strategy?

Larry, Curly and Moe go to Washington image credit: Wall Street Journal As we more>>

By Jon Miller - November 27, 2008 10:00 PM4 comments>>
It's a Lousy Time to Implement Lean

Author, teacher and our friend Bob Emiliani from the Center for Lean Business Management pointed more>>

By Jon Miller - November 25, 2008 8:08 PM4 comments>>
Blogroll
Improve With me
Lean Companies
Agile Management Blog
Curious Cat
DailyKaizen
Evolving Excellence
Fashion-Incubator
Got Boondoggle?
Lean Blog
Lean Insider
Lean Builder
Lean Reflections
Lean Six Sigma Academy
Learn Sigma
Productivity Cafe
Reforming Project Management
Shmula
The Lean Thinker
Thinking for a Change
TPM Log