Guidelines for Continuous Moving Lines

This article is in response to a question posted by a reader about guidelines for continuous moving lines as part of a Lean manufacturing implementation. This is not a comprehensive list of all things to consider when designing and managing moving lines, but it is a good start.

1 - 100% efficiency is not the goal at Toyota. There's a good explanation of this idea by Brad Schmidt in a previous article. The premise is that if you have a line that runs at 100% you are hiding your problems. It is better to expose and eliminate these problems and work 5% overtime to catch up.

2 - Product and production line stability. Part of the design of any line should be determining the frequency and severity of failures and line stops using either past data from comparable lines, or by conducting FMEAs and Process FMEAs, verifying with trials before run at rate. This provides two benefits. First, you can eliminate, prevent or mistake proof potential failures. Second, you can determine the appropriate level of support needed on the line to rapidly address these problems and keep the lost time under control.

3 - Appropriate span of control for supervisors, line leaders, and team leaders. Industrial Engineers can tell you that theoretically, the line will run at 80%, 90% or whatever the standard is based on allowances. The truly Lean approach is to design the line and the support needed to keep this line running at 95% or better. This includes the appropriate number of workers per team leader and supervisor. If the frequency and severity of problems cannot be determined as in 2 above, start with 5 workers per team leader and expand their span as the process stabilizes. If the span is smaller than 5, revisit the stability issue and reconsider your process design.

4 - Fixed position stop vs. continuous moving line. Question the type of moving line you need. Some pacing mechanism is needed, but whether the line should move continuously, work in a stopped position and move for conveyance only, or whether it should move and stop is worth testing, depending on line speed, size and complexity of product, and the material logistics to the line. A fixed-position stop system at Toyota helps resolve problems on continuously moving production lines by allowing a duration and length of line between stations to address problems. If problems are not resolved before a fixed point, the production line stops.

5 - Straight line vs. u-shaped line. The main benefit of a curved or u-shaped line is to allow workers on the line to flexibly work at both beginning and end of line stations. For lines with fewer than 8 people, this also allows the team leader or supervisor to have a view of the total line and step in easily in any position. Material logistics often straightens out the line.

6 - Material quality and availability. Don't plan on a smoothly moving line if your materials don't move smoothly. Make sure that your logistics systems supports delivery quality materials on-time to the point of use. Often this is a smaller investment with a larger impact, overlooked until the new production line is up and running. Even the perfect moving line will stop without parts.

7 - Building on-line vs. using feeder lines. While it may seem easiest to line up all of the parts and build from star to finish on a moving line, in reality there can be variation in cycle times due to product variation or simply because some operations are not as stable as others. It is a good idea in these cases to create sub-assembly feeder lines adjacent to the moving line, synchronized with the main line or using one-piece buffers. If the process is simple and has little variation, building it on the same line may work just as well.

8 - Appropriate use of automation. One of the biggest heartbreaks in the Lean business is to arrive at a new client site just weeks or months after they have proudly (and unnecessarily) expanded their plant or installed a disastrous (in Lean terms) bit of automation. We got there too late! Not only does this reduce the available cash for proper Lean training and investment in people and methods design, misguided accounting principles demand that these bits of inappropriate automation continue to be utilized. And of course there is the loss of face when clients do come around and begin to dismantle these systems, not to mention the removal and disposal cost. Start simple. Design and build the line as if you had no money. Use what you have. Build bare bones equipment. Take a zero off of the budget and see what happens.

All you smart people out there feel free to add on to this list.

By Jon Miller - October 11, 2007 10:01 AM

Comments

I think that we have finally decided on the line speed for our work stations. Our takt time is 120 seconds but our line will move through each station at 118 seconds. I still think this is a little high but I don't have any say in the matter. The next problem we have is how many seconds worth of work each operator should have. We are trying to balance all the jobs to 116 seconds but that doesn't really give anyone enough time to try and fix a problem before it gets out of their work zone. The andon system will make the line stop but shouldn't there a little more time to try and fix a problem before this happens.

Posted by: Kevin Young - October 11, 2007 7:32 PM

Try to target 95% of takt for cycle time at each station. That gets you to 114 seconds at 120 seconds takt, or 112 at 118 seconds takt.

I think you will find that much higher than that and you will lose more than you will gain.

Most likely this will require some kaizen to take out the waste and balance each operation closer to 95%.

Try it out and let us know what you learn.

Posted by: Jon Miller - October 12, 2007 3:19 AM

Post a Comment

Comments are moderated to filter spam and inappropriate content. There may be a delay before your comment is published.




Recent Artices
Virtual Facory Tours on YouTube

Keep your chin up, global manufacturing! Even though new factory orders dipped recently to record more>>

By Jon Miller - January 4, 2009 4:53 PM0 comments>>
Ask Gemba

We want to make it easier to start conversations and find answers here at more>>

By Jon Miller - January 3, 2009 1:57 PM0 comments>>
5 Ways to Boost Kaizen Consciousness in 2009

Improved quality, reduced cost, better teamwork, faster response to customer needs - there are as more>>

By Jon Miller - January 1, 2009 11:19 PM1 comments>>
HP Printer Pokayoke Example

This is a new HP C7250 printer we purchased a few weeks ago. It's quite more>>

By Jon Miller - December 30, 2008 12:53 AM0 comments>>
Yaruki: The Will to Win Even in Tough Times

RC Bhargava, the Chairman, Maruti Suzuki India recounts the story of Maruti Suzuki and how more>>

By Jon Miller - December 28, 2008 7:53 PM3 comments>>
9 Surprises for U.S. Manufacturing in 2009

1. Will you shut up about kaizen, Tom? Newly appointed U.S. Secretary of Agriculture more>>

By Jon Miller - December 24, 2008 4:05 PM4 comments>>
Let's Do Kaizen, Not Kaizan

It doesn't really matter how you pronounce the Japanese word for continuous improvement through more>>

By Jon Miller - December 23, 2008 12:20 PM0 comments>>
Answers to Lean Thinking Crossword Puzzle #1

Spoiler alert! The answers to Lean Thinking Crossword Puzzle #1 are below. Here are the more>>

By Jon Miller - December 20, 2008 2:20 AM0 comments>>
Lean Thinking Crossword Puzzle #1

Here is a quiz we used as a review of lean knowledge for the team more>>

By Jon Miller - December 19, 2008 3:24 AM0 comments>>
Field Report from Gemba Tour #62, Part 4

Today was day-long visit to a company who is 13 years on their lean more>>

By Jon Miller - December 18, 2008 8:16 AM1 comments>>
Field Report from Gemba Tour #62, Part 3

Today wast the Toyota plant tour day of our Japan Kaikaku Experience #62. I noticed more>>

By Jon Miller - December 17, 2008 5:21 AM0 comments>>
Field Report from Gemba Tour #62, Part 2

I have seen the future of logistics, and it is green. Today we visited more>>

By Jon Miller - December 16, 2008 7:08 AM3 comments>>
Field Report from Gemba Tour #62, Part 1

The last few weeks haven't been very productive ones for writing blog articles due more>>

By Jon Miller - December 15, 2008 5:34 AM2 comments>>
If Blame Helped Solve Problems...

...the interview with Newt Gingrich on Fox News would be a brilliant way to get more>>

By Jon Miller - December 5, 2008 11:07 PM8 comments>>
$34,000,000,000

Sigh. Chrysler wants $7 billion. They asked Congress for this taxpayer money in a 14-page more>>

By Jon Miller - December 2, 2008 8:11 PM5 comments>>
PDCA is About Not Telling Lies

This circle doesn't lie. In fact one could say that used properly, it is more>>

By Jon Miller - December 1, 2008 5:39 AM6 comments>>
With Competitors Like These, Who Needs a Winning Business Strategy?

Larry, Curly and Moe go to Washington image credit: Wall Street Journal As we more>>

By Jon Miller - November 27, 2008 10:00 PM4 comments>>
It's a Lousy Time to Implement Lean

Author, teacher and our friend Bob Emiliani from the Center for Lean Business Management pointed more>>

By Jon Miller - November 25, 2008 8:08 PM4 comments>>
The Big 3 Must Follow in Toyota's Footsteps to Survive

The Big 3 automotive companies must follow in Toyota's footsteps to survive. There are three more>>

By Jon Miller - November 23, 2008 7:34 PM6 comments>>
Ambiguous Visual Controls: This Way is Up

This makes it three for three on scoring photos of ambiguous visual controls during visits more>>

By Jon Miller - November 12, 2008 2:51 PM3 comments>>
Blogroll
Improve With me
Lean Companies
Agile Management Blog
Curious Cat
DailyKaizen
Evolving Excellence
Fashion-Incubator
Got Boondoggle?
Lean Blog
Lean Insider
Lean Builder
Lean Reflections
Lean Six Sigma Academy
Learn Sigma
Productivity Cafe
Reforming Project Management
Shmula
The Lean Thinker
Thinking for a Change
TPM Log