Three Ways to Draw Future State Value Stream Maps

A value stream map is a diagram showing the flow of the material, goods or services and also the supporting information flow. It is typically drawn in a clockwise fashion beginning at the customer in the two o'clock position, backwards through the material and information flow until a complete circle is made from customer request to fulfillment of that request. The current state represents today's reality as observed and documented by people. The whole point of the mapping exercise is to build consensus on the problems and what needs to be done so the organization can take action.

CSVSM708.png

The future state map is created to show us the way to go. There are at least three ways to draw future state value stream maps.

1. The "begin with the end" approach. One way to draw the future state value stream map is to envision the ideal state and work your way back to an interim implementation time line such as 6 or 12 months. While this is fast and powerful, it requires that you have a clear vision of the ideal or "what good looks like" based on a model of process excellence such as TPS. Or if you are really creative and can think outside the box, a flash of insight may deliver the process innovation. Perhaps the greatest risk with this approach is that smart people are good at fooling themselves into thinking they know the answer. They fall in love with their future state and spend less time studying the current state and its flaws when compared to any ideal.

2. The incremental approach. A second way is to systematically identify and eliminate waste from the current state map, and a new "current state" with less waste your future state. This could include bringing processes closer together, reducing error rates or inventories. This is somewhat tactical and moves your towards the ideal condition step by step, unless you stop seeing the waste. This method requires that you get smarter or sharper in your observation as your current state improves over time. Many have bought the books and employed IEs to faithfully apply the tools, only to get stuck at some point because a vision was lacking. Maintaining a strong customer focus and studying lean systems and solutions will help this approach succeed.

FSVSM708.png

3. The cookbook approach. Ask the "10 questions" for building a future state by applying the lean tools based on a recommended method. The questions vary and the number 10 is arbitrary. The questions typically address takt time / pacemaker, continuous flow, kanban / pull signal / supermarkets, heijunka / leveling, scheduling point, standard work / work balancing, lot size reduction / SMED, build to order vs. build to stock and 3P / product & process design approach. We have seen anywhere from 7 to 12 questions, and in each case the approach tends to be somewhat prescriptive, or fit to the worldview of a particular consultant or leaning organization's lean implementation standard. If this approach is used, it needs to be customized for whatever type of industry or business you are in. Perhaps the biggest weakness is that this approach rarely if ever identifies organizational, leadership or foundational behavior issues that are causing the current state to be as bad as it is.

The zeroth way. Draw no future state map at all. A detailed current state map completed with plenty of data based on go see gathering is better than a premature future state map built around a little education and a lot of excitement. A few change loops defining where to start and what to do next may be just as good as a future state map.

CSVSM708LP.png

The most important part of value stream mapping is the kaizen activity that follows it, based on the PDCA cycle.

By Jon Miller - July 16, 2008 11:41 PM

Comments

It was really informative Jon. It may be confused though, I take it that this is the follow through on a stuck A3 Strategy Sheet? Is this a detailed approach on alternative steps to address the current "botched" situation?

The PDCA cycle has always been incorporated in the A3 Strategy Sheets as part of the complete cycle of any project after defining the project's aim/s, responsible ownerships and setting the corresponding time tables for completion.Do you still need this if the A3 Strategy Sheet is covering the whole cycle of the project and is proceeding as planned and approved by the stakeholders?

Posted by: John Santomer - July 20, 2008 11:25 PM

Hi John,

Most of lean world does not use the A3 sheet yet, but value stream mapping by itself is very popular. So to answer your question directly, "no".

Value stream mapping is often a team activity preceding or as part of a kaizen, taking 1-5 days or more on a big sheet of paper, collecting data and "grasping the situation". It can certainly be a tool that is used as part of the A3 process. Actions that result from VSM should follow PDCA.

But most users of VSM do not incorporate it into the A3 process, as yet.

Posted by: Jon Miller - July 22, 2008 12:43 PM

I see VSM and A3 as different systems entirely. VSM should be, I believe, the first step in understanding how things really are in your plant (or other business entity), how it will look in your "ideal" state, and where you should use specific tools to improve the flow. A "map" shows where the flow stops and that is where our energy should be put. The map allows us to really see what is going on as a whole and how each part relates to the others. It is a vital process, but comes before any A3 strategy or kaizen plan. The current prevalence of conducting a mapping exercise just prior to a kaizen event defeats the entire purpose of the map. The map should be THE MAP--directing our lean journey.

Posted by: Mike - July 23, 2008 12:27 PM

Ok, but what do you do when one machine is shared by several product families ?
It looks fine, because the takt time is for instance 15 min/piece, and the machine cycle time is 5 min/piece. But in fact the machine is not available 100% for this product family...

Posted by: Thomas - September 1, 2008 6:49 AM

If a machine is shared by more than one product family, and a product family is defined as a value stream (as opposed to a value stream that contains several product families for whatever reason) then this will most likely be shown with a supermarket or inventory stock point after the process. This inventory represents the build-up of stock of one product family, to maintain supply during the time when the other type is being produced.

There would also be a changeover time indicated in the data box, the number of shifts the machine is operated and even the percentage of available capacity can be shown.

Once it is clearly established that a machine is shared between multiple products, the takt time for that machine is calculated separately based on the net available time divided by the total customer demand for all product families. So long as the average weighted cycle time is lower than the takt time for all product families, there should be no problems. But in fact it is best to fill out what is called a Table of Production Capacity by Process (or Process Capacity Table) to figure out if you have enough capacity.

Changeover times will need to be deducted from available times, based on the frequency of changeovers per shift. In fact Overall Equipment Effectiveness (OEE) should be taken into account if it is measured for that machine when calculating takt time.

Note that even if machines in a value stream serve only one product family, the available time (number of shifts operated) may be different, so it is important to ask these questions and do the takt time calculation per each process.

Posted by: Jon Miller - September 1, 2008 7:10 AM

Post a Comment

Comments are moderated to filter spam and inappropriate content. There may be a delay before your comment is published.




Recent Artices
Virtual Facory Tours on YouTube

Keep your chin up, global manufacturing! Even though new factory orders dipped recently to record more>>

By Jon Miller - January 4, 2009 4:53 PM0 comments>>
Ask Gemba

We want to make it easier to start conversations and find answers here at more>>

By Jon Miller - January 3, 2009 1:57 PM0 comments>>
5 Ways to Boost Kaizen Consciousness in 2009

Improved quality, reduced cost, better teamwork, faster response to customer needs - there are as more>>

By Jon Miller - January 1, 2009 11:19 PM1 comments>>
HP Printer Pokayoke Example

This is a new HP C7250 printer we purchased a few weeks ago. It's quite more>>

By Jon Miller - December 30, 2008 12:53 AM0 comments>>
Yaruki: The Will to Win Even in Tough Times

RC Bhargava, the Chairman, Maruti Suzuki India recounts the story of Maruti Suzuki and how more>>

By Jon Miller - December 28, 2008 7:53 PM3 comments>>
9 Surprises for U.S. Manufacturing in 2009

1. Will you shut up about kaizen, Tom? Newly appointed U.S. Secretary of Agriculture more>>

By Jon Miller - December 24, 2008 4:05 PM4 comments>>
Let's Do Kaizen, Not Kaizan

It doesn't really matter how you pronounce the Japanese word for continuous improvement through more>>

By Jon Miller - December 23, 2008 12:20 PM0 comments>>
Answers to Lean Thinking Crossword Puzzle #1

Spoiler alert! The answers to Lean Thinking Crossword Puzzle #1 are below. Here are the more>>

By Jon Miller - December 20, 2008 2:20 AM0 comments>>
Lean Thinking Crossword Puzzle #1

Here is a quiz we used as a review of lean knowledge for the team more>>

By Jon Miller - December 19, 2008 3:24 AM0 comments>>
Field Report from Gemba Tour #62, Part 4

Today was day-long visit to a company who is 13 years on their lean more>>

By Jon Miller - December 18, 2008 8:16 AM1 comments>>
Field Report from Gemba Tour #62, Part 3

Today wast the Toyota plant tour day of our Japan Kaikaku Experience #62. I noticed more>>

By Jon Miller - December 17, 2008 5:21 AM0 comments>>
Field Report from Gemba Tour #62, Part 2

I have seen the future of logistics, and it is green. Today we visited more>>

By Jon Miller - December 16, 2008 7:08 AM3 comments>>
Field Report from Gemba Tour #62, Part 1

The last few weeks haven't been very productive ones for writing blog articles due more>>

By Jon Miller - December 15, 2008 5:34 AM2 comments>>
If Blame Helped Solve Problems...

...the interview with Newt Gingrich on Fox News would be a brilliant way to get more>>

By Jon Miller - December 5, 2008 11:07 PM8 comments>>
$34,000,000,000

Sigh. Chrysler wants $7 billion. They asked Congress for this taxpayer money in a 14-page more>>

By Jon Miller - December 2, 2008 8:11 PM5 comments>>
PDCA is About Not Telling Lies

This circle doesn't lie. In fact one could say that used properly, it is more>>

By Jon Miller - December 1, 2008 5:39 AM6 comments>>
With Competitors Like These, Who Needs a Winning Business Strategy?

Larry, Curly and Moe go to Washington image credit: Wall Street Journal As we more>>

By Jon Miller - November 27, 2008 10:00 PM4 comments>>
It's a Lousy Time to Implement Lean

Author, teacher and our friend Bob Emiliani from the Center for Lean Business Management pointed more>>

By Jon Miller - November 25, 2008 8:08 PM4 comments>>
The Big 3 Must Follow in Toyota's Footsteps to Survive

The Big 3 automotive companies must follow in Toyota's footsteps to survive. There are three more>>

By Jon Miller - November 23, 2008 7:34 PM6 comments>>
Ambiguous Visual Controls: This Way is Up

This makes it three for three on scoring photos of ambiguous visual controls during visits more>>

By Jon Miller - November 12, 2008 2:51 PM3 comments>>
Blogroll
Improve With me
Lean Companies
Agile Management Blog
Curious Cat
DailyKaizen
Evolving Excellence
Fashion-Incubator
Got Boondoggle?
Lean Blog
Lean Insider
Lean Builder
Lean Reflections
Lean Six Sigma Academy
Learn Sigma
Productivity Cafe
Reforming Project Management
Shmula
The Lean Thinker
Thinking for a Change
TPM Log